Server Installation & Best Practices Guide

The following information is intended to provide general guidelines and best practices when
installing Salient rack-mountable PowerProtect servers. Including information on:

  • Hot Aisle/Cold Aisle
  • Estimating Airflow Rates and Cooling Capacity
  • Rail, Rack, and Server Installation Guide

Learn more by clicking the link below or downloading.

Leave a comment